Project Experiences
Portsite Power Plant Project (Phase I)
Owner: PT. FREEPORT INDONESIA
Project Location: Timika, Papua
Portsite Power Plant Dual Fuel 140 MW is a comprehensive undertaking that involves the Site Preparation, civil works, erection of steel structures, mechanical installation, electrical and instrumentation installation, and the final commissioning of the power generation facility. This project is designed to deliver a fully operational power plant that meets the highest standards of efficiency, reliability, and safety.
Owner: PT RIG Nusantara Jaya (2021 – 2022)
Scope of Works:
Civil Works:
- Site Preparation
- Duct bank construction
- Foundation construction
- Drainage System Construction
- Epoxy work
- Painting Work
- Road Pavement construction
- Landscape work
Owner: PT Maju Bersama (2021 – 2022)
Scope of Works:
- Steel Structure Erection:
- Mechanical Installation
- Piping Installation
- Piping Installation:
- Electrical & Instrument Installation
Refinery Development Master Plan (RDMP) Project
Owner: PT. Hyundai ENC
Project Location: Balikpapan, East Kalimantan
The Refinery Development Master Plan (RDMP) Project in
Balikpapan is a strategic initiative aimed at modernizing and
expanding the existing refinery infrastructure to increase its
capacity, efficiency, and environmental performance. This
project is a critical component of the nation’s energy strategy,
designed to enhance the production of refined petroleum
products and meet the growing demand for energy in the
region.
150 kV Power Line Manyar Smelter Project
Owner: PT. Freeport Indonesia
Project Location: Gresik, East Java
The 150 kV Power Line Manyar Smelter Project is a crucial
infrastructure development designed to support the energy
needs of the Manyar Smelter, a key industrial facility in the
region. This project involves the construction of a high-voltage
power transmission line to ensure a reliable and efficient
supply of electricity to the smelter, enabling continuous
operations and optimal production capacity.
Mill Optimization Portsite Project Packages (MOPP) – Phase II
Owner: PT. Freeport Indonesia
Project Location: Gresik, East Java
Mill Optimization Port Site Project packages consist of three
projects that start within a closed timeline. The first project
involves the extension of four engines in the existing power
plant, the second project focuses on replacing the existing
splitter box in TK-211, and the third project focuses on
constructing 13,8 kV Power Line for new Liquid Natural Gas
(LNG) facilities.